VOLFERDA Apple Cabin Model D1
The first floor:
Beds: 1,Bath:1,Area: 51.7m² ,LxWxH: 11.5m x 4.5m x 2.45m
The second floor:
Beds: 1,Bath:1,Area: 25.8m² ,LxWxH: 11.5m x 2.25m x 2.45m
Pavilion:Area: 25.8m² ,LxWxH: 11.5m x 2.25m x 2.45m
Terrace:Area: 25.8m² ,LxW: 4m x 5m
Standard configuration:
- Fine finishing, curtain mechanism, thermal insulation, waterproofing, wind protection, smart lock, internal and external lighting, electricity wiring, sewerage, water treatment.
-
kitchen (induction cooker,lower and upper cabinets, sink, artificial stone countertop), bathroom (toilet, sink, smart mirror, sink cabinet, sofa, coffee table, TV cabinet, double bed, bedside table, refrigerator, TV.
1. Details
- Main Struction
- Interior:
- Utilities
Communal cable, less insulated PVC piping, communal water and pressurized drainage piping, three-hole socket, switch panel/USB panel
- Baths(optional)
- Kitchen (optional)
- Appliance(optional)
Air conditioner, Electric water heater, refrigerator, washing machine with drying, 4K Projector, Floor heating, Electric curtain
- Furniture(optional)
Sofa, Bed, Coffee table, Lounge Chair
2. Delivery
Delivery:
Delivery place: factory located in Foshan, China, the nearest port of delivery is Nansha port in Guangzhou, or Shekou port in Shenzhen.
Installation: Our services do not include installing the house. But modle D1 installation is not difficult, just need the crane to put 3 cabins and 1 pavilion together and placed on the base prepared in advance. we will give you the necessary assembley drawings and video tutorials to help you install it locally.
If you buy a lot of houses for your project, we can also arrange for a Volferda engineer to go to the project site to guide the assembly and installation, or a local agent to help you with the installation. At present we have agents in Europe, the United States, the Middle East, Australia and other regions. There is an extra charge for this service.
*we can also support DDP(Door to Door), if you are an individual customer with no experience of importing from China, but you will need to contact our sales manager for detailes.
Delivery time:
Production: 45 daysDelivery time: 20-35 days
Therefore, we can deliver to any country in the world.
*Time may vary depending on holidays in China and the destination country and the complexity of the route to the delivery site.
3. Payment
Payment methods
T/T payment
Payment procedure
4. Floor Plan